Skip to main content

RRB NTPC, Level 1 posts Recruitment 2019: Notification out for 1,30,000 vacancies, check details here

Railway Recruitment Board Job Alert: 1.30 lakh Indian Railways Jobs - RRB NTPC , Level 1 Recruitment age limit, eligibility here


Railway Recruitment Board – RRB Recruitment 2019 – 1,30,000 Openings
NTPC, Para Medical Staff & Various Vacancy – Coming Soon
RRB Vacancy Details
CEN No. 
Exam Group
No Of Vacancy (approx.)
Pay Scale
RRB/CEN 01/2019
Non-Technical Popular Categories (NTPC)
30,000
As per 7th CPC Pay Matrix
RRB/CEN 02/2019
Para-Medical Staff
RRB/CEN 03/2019
Ministerial And Isolated Categories
RRC-01/2019
Level-1 Posts
1,00,000
Eligibility Criteria for RRB Recruitment
Education Qualification 
Age Limit
As per official Notification

As per rules of RRB
Application Fee

Gen/ OBC (400 refundable)
500
Pay the Examination Fee through Debit Card, Credit Card, Net Banking.
SC/ ST/ Ex-Servicemen/ PwBDs / Female / Transgender / Minorities/ Economically Backward Class (250 refundable)
250
Important Dates to Remember
Starting Date to Apply Online (Non-Technical Popular Categories (NTPC)) by RRBs
28 Feb 2019 10:00 AM
Starting Date to Apply Online (Para-Medical Staff) by RRBs
04 Mar 2019 10:00 AM
Starting Date to Apply Online (Ministerial And Isolated Categories) by RRBs
08 Mar 2019 10:00 AM
Starting Date to Apply Online (Level-1 Posts) by RRCs
12 Mar 2019 10:00 AM

Important Links
Advt. Details Link
Apply Online
Official Website

Comments

  1. Nice work....keep uploading all information..

    ReplyDelete
    Replies
    1. Thank you,surely i ll update each and every information

      Delete

Post a Comment

Popular posts from this blog

ME -PRODUCTION PLANNING AND CONTROL Notes-MECHANICAL

THIS BLOG IS ABOUT PRODUCTION PLANNING AND CONTROL. Production planning and control is a tool available to the management to achieve the stated objectives.Thus, a production system is encompassed by the four factors. i.e, quantity, quality, cost and time. Production planning starts with the analysis of the given data, i.e., demand for products, delivery schedule etc., and on the basis of the information available, a scheme of utilization of firms resources like machines, materials and men are worked out to obtain the target in the most economical way.Once the plan is prepared, then execution of plan is performed in line with the details given in the plan. Production control comes into action if there is any deviation between the actual and planned. The corrective action is taken so as to achieve the targets set as per plan by using control techniques. Thus  production planning and control can be defined  as the “direction and coordination of firms’ resources towar...

Innovation in aerospace -inter meshing rotors -MECHANICAL

My blog is about inter-meshing dual rotor technology in helicopters   Amazing innovation :Inter meshing dual rotors helicopter  PLEASE CLICK THE VIDEO HERE  This helicopter has dual crossing rotors for increased precision.  Intermeshing rotors on a helicopter are a lot of two rotors turning in inverse ways, with every rotor pole mounted with a slight point to the next, in a transversely symmetrical way, so the cutting edges intermesh without impacting. The game plan enables the helicopter to work without a tail rotor, which saves power. However, neither rotor lifts directly vertically, which reduces efficiency per each rotor.